{"name":"software.brainiac/electrical-engineering","title":"BRAINIAC Electrical Engineering & Installation Intelligence","endpoint":"https://www.brainiac.software/mcp/electrical-engineering","repository":null,"page":"https://lazaretto.dev/mcp-registry/software-brainiac-electrical-engineering","badge":"https://lazaretto.dev/mcp-registry/software-brainiac-electrical-engineering/badge.svg","listed_at":"2026-11-20T18:34:41.045Z","state":"no findings","check":{"checked_at":"2026-11-20T22:14:35.719Z","outcome":"read","tool_count":10,"tool_names":["electrical-engineering_load-schedule-calculate","electrical-engineering_three-phase-load-balance-check","electrical-engineering_voltage-drop-calculate","electrical-engineering_cable-sizing-calculate","electrical-engineering_breaker-rating-check","electrical-engineering_transformer-capacity-calculate","electrical-engineering_power-factor-correction-calculate","electrical-engineering_generator-sizing-calculate","electrical-engineering_ev-charger-load-capacity-check","electrical-engineering_design-document-audit"],"sets_instructions":true,"verdict":"clear","findings":[],"rules_version":"2026.11.19a"},"tools":{"fingerprint":"1e0db115022b5dd4598576f51cd53a88caa90b4444882b35e80ef921eb939f55","tool_hashes":{"electrical-engineering_breaker-rating-check":"f71384b7f3038dcf48b8d17a0d6135231cae247bf0928e70efdec79602470582","electrical-engineering_design-document-audit":"a9c682229507edcfb0a565c2d86c1ad88c87cd4bb3f2754c0311d45abc0fef88","electrical-engineering_cable-sizing-calculate":"13c1a67c965cab547d9d0a35f302125ac8aa8a19daf3a1dfeb77fc57b53a9b55","electrical-engineering_voltage-drop-calculate":"2db75ceeb33350bfbabfb88682a63dcad596f7f2e2ee84fc3e4258575ec32b53","electrical-engineering_load-schedule-calculate":"2213adebb9cb12423f3fc8fb4e0523fd80707d2486f5b5d71996daf259f05cbe","electrical-engineering_generator-sizing-calculate":"2516c25e75499ba74876844d6848d790a04992b633e34aef8f4ac24e8f830dac","electrical-engineering_ev-charger-load-capacity-check":"c0c67fc65cbed2f408d069de41737f67ed5d6738b21d7e383a83c191b3958a6e","electrical-engineering_three-phase-load-balance-check":"61859c718e66bcd178b817ca161e6eccc53702a8f7be616ba2c88b577e7e0ef8","electrical-engineering_transformer-capacity-calculate":"e6165b347923ee3e92b5120e3367e12f8a1d7a71296c1b068aae96af70a04ca5","electrical-engineering_power-factor-correction-calculate":"12c4874b414f7cd96f2aa5759159e39c0cbc05cad2aed8f668a4cbdea6869840"},"instructions_hash":"79ecc565d36575e4d524d7376970b9fcb0b47269bcc04577decee1ea5202b9cb","fingerprinted_at":"2026-11-20T22:14:35.719Z","changed_at":null,"compared_since":"2026-10-30","changes":[]},"disclaimer":"Signals, not a warranty. A clean read means these rules found nothing, not that the server is harmless. An unread server is not checked."}